Hollow-block slab with rib and beam reinforcement before the pour.View photograph +
Hollow-block slab with rib and beam reinforcement before the pour.

A connected sequence of site preparation, foundations, concrete construction and masonry. Reinforcement, formwork, pours and supply were organised around each structural element, with openings, service routes and work across successive floors coordinated on site.

  1. Site preparation & foundations

    Surveying, excavation, footing preparation, concrete works, waterproofing and curing.

  2. Columns & formwork

    Column reinforcement, formwork and bracing, with coordinated execution between floors.

  3. Concrete slabs

    Slab formwork, hollow-block infill, rib and beam reinforcement, openings and service routes prepared before the pour.

  4. Masonry & construction sequence

    Masonry, material supply and site requirements coordinated to connect the structural sequence with the following works.